Transitional Housing
Kai Fook Kui · Architecture
Architecture & Design · 建築與設計
Modular by Design, Rooted in Kai Tak
Kai Fook Kui is built with Modular Integrated Construction (MiC) on Kai Tak Area 1B3 — three-dimensional steel modules are factory-fit off-site, then bolted together on-site in months rather than years.
- Construction Method
- Modular Integrated Construction (MiC)
- Site
- Kai Tak Development Area, Muk On Street Lot 1B3
- Scale
- ~721 units · ~1,600 residents
- Completion
- Completed Jun 2024 · Move-in Aug 2024
- HB Subsidy
- HK$385,000,000